W.Tech RAA Series Bedienerhandbuch Seite 11

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 16
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 10
Pag10
7. GENERALMAINTENANCEINSTRUCTIONS
Duetothequalityoftheseunits,maintenancerequirementsareminimal.Nevertheless,theywillbeinspectedfullyonamonthlybasis.Inthe
sameway,theentirecircuitshouldbecleanedeveryyear.
Itisadvisabletocarryoutcertainactionsregularlyinordertoensurethatyouachievetheservicelifeandpe
rformancethattheseunitshave
beendesignedfor
Therearetwobasicareastocover:

1. Waterrecirculationsystem
2. Airblowingsystem
7.1 Inthewaterrecirculationsystem
Duetothefactthatthesystem sinwhichtheseproductsarebasedarerelatedtoevaporation,somesaltyconce
ntrations,aswellas
suspendedsolidsareproduced.
Therefore,somesecondarywaterflowhastoberemoved,inordertopreventtheconcentrationsinthecoils.Thedrainageconnection
willbeusedtodothis.
Thewaterconditionswillbecontrolledcontinuouslyandautomatically,bypurgingofdirtywaterandre
placementwithclean,addition
ofbio dispersant agentsand biocides,inhibitorsto preventlimescale frombuildingup orthecorrosionofthemetallicpartsofthe
circuit. Several varieties are commercially available and the most suitable shouldbeselected in consultation with specialised firms,
whohavethekno
wledgeofthewaterintheinstallationsandthearea.Becarefulifanyaci d productisbeingused,duetothefactthat
isnotrecommendedthePHtobelowerthan6.5.Anotheraspecttotakeintoconsiderationisthefactthattheproductsbeingused
havetobecompat
iblewiththekindofmaterialscomposingthecoolingtowers.
Theseunitswillbedisinfectedtwiceayear,atthebeginningofspringandofautumn,aswellasinthefollowingcircumstances:
Beforeputtingintooperation.
Iftheyhavebeenstoppedforalongperiodoftim
e.
Whenrepairshavebeencarriedout.
Whenroutineinspectionsoindicates.
WhentheSanitaryAuthoritiessodetermines.
Disinfectionwillbecarriedoutusingauthoriseddisinfectants;ifchlorineisused,inject5p.p.m.ofchlorineplusbiodispersantsinto
thebasinandsetthepumpsrunningforfivehours.Thefanswillbestopped.
Following this, all the water will be drained fr
om the circuit and it will be cleaned thoroughly, adding water until the drain wate r
appearsclean.
Finally,itwillbefilledwithcleanwaterandbetween5and15p.p.m.ofchlorinewillbeadded.Thepump
swillbeallowedtorunfor5
hours,withthefansstopped(checkthechlorineleveleveryhour).
Thewaterconditionswillbecontrolledcontinuouslyandautomatically,bypurgingofdirtywaterandreplacementwithclean,addition
ofbio dispersant agentsand biocides,inhibitorsto preventlim
escale frombuildingup orthecorrosionofthe metallicpartsofthe
circuit.
Thewaterwillbedrainedoutofthebasinwhentheunitisnotinuse.
Themaintenancefunctionstobecarriedoutforthedifferentelementsarelistedbelow.
7.1.1 Grid
Thishastobecl
eanedmonthly,orasfrequentlyasthesedimentpresencerequires.
7.1.2 Basin
Thishastobecleanedanddrainedmonthly,orasfrequentlyasthesedimentpresencerequires.
7.1.3 Watermakeup
Floatvalvewillbecheckmonthly,aswellasthewaterlevelinthebasin,italwayshastowo
rkabovethegridandsuctionlevel
oftheelectricpump.
7.1.4 Electricpump
No special maintenance is needed. After around 10,000 working hours, bearings have to be checked, as well as the
mechanicallocking.
Ifthetowerisbeingstoppedforawhile,theremovalofallwaterinsidethepumpisreco
mmended,bymeansofthedrainage
connectionatthebottom.
VERYIMPORTANT!!WHENRUNNINGTHEPUMPAFTERBEINGSTOPPED,ALWAYSTAKEINTOCONSIDERATIONTHATTHEPUMPMUST
BECHARGED.
7.1.5 Waterdistributionsystem
Thishastobecheckedmonthly.Todoso,someeliminatorblockshavetoberemovedinordertoinspecttheinsidepart.The
fanshavetobestoppedandtheelectricpumpwillbeswitchedon.
The nozzles, whic h are wide passage, with minimum possibilities of brea
king down or blocking, allowing perfect water
distribution(fullcone)overthecoil.Ifbyanychancetheybecomeclogged,theycanbedissembledveryeasily.
 Thiswillmeanthatthegridisnotclean,orthedistributionpipesaredirty.
Therefore,thegridwillbecleaned,thenozzleswillberem
ovedifnecessarytodoso,and thepumpwillbeswitchedon,in
ordertoclean thepipes. If the nozzles have to be removed, when reinstalling intheirplace,becar eful to put them in the
correctposition,asshowninfig.10.

Seitenansicht 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16

Kommentare zu diesen Handbüchern

Keine Kommentare